| |
|
| Here are a selection
of projects from our extensive client base. Please click
the photos to see more photos of
the projects.
|
|
|
Dorchester Hotel Spa area |
| Client |
|
Dorchester Group |
| Address |
|
Park Lane |
| Designer |
|
Fox Linton Associates |
| Description |
|
Lambro Contracts Ltd has now completed the new Spa area at the Dorchester hotel, London. The works included a complete strip out of the existing area before the new layout was formed. These works were completed in 6 months and include the building of Treatment / Steam rooms, Gym, Hair Salon along with relaxation and reception areas. Lambro Contracts also carried out the complete M/E services along with new walls, ceilings, flooring and decoration to all areas. |
| |
|
Click
for more details >> |
|
|
|
Mayfair Hair Salon |
| Client |
|
N/A |
| Address |
|
Mayfair , London |
| Designer |
|
Caulder Moore |
| Description |
|
Lambro Contracts Ltd recently started the refurbishing of a Hair Salon in Mayfair, London. Working with the client and Caulder Moore Design, Lambro will be working on the site for the next 24 weeks over 5 phases. The salon is to remain open during these works as we transform the salon , treatment rooms and nail salon in the basement. Works are to include demolition and strip out , full mechanical and electrical package, new walls, ceilings and floor finishes through out. We are also manufacturing numerous bespoke joinery items including a new curved feature reception desk in our joinery workshop in Wickford. |
| |
|
Click
for more details >> |
|
|
|
Sanctuary Health Spa |
| Client |
|
Sanctuary |
| Address |
|
Covent Garden |
| Designer |
|
Charles Leon Designers |
| Description |
|
Lambro Contracts Ltd, working with Charles Leon Design were asked to manufacture a new reception desk for the Sanctuary Health Club in Covent Garden. The unit was designed to accommodate the computer system for booking in appointments and incorporated mirrors in a frame to the front with an etched glass top. Lambro Contracts setting out department worked closely with the design team to make sure the clients requirements were met.
Lambro Contracts also made three upholstered storage units complete with mirrored doors and tops.
While working on the contract we were also asked to fit out the comb out area in changing rooms with new mirrors, worktop and lighting.
|
| |
|
Click
for more details >> |
|
|
| |